Higher standards of treatment in the hospital in Bolesławiec

Modernization of the Operating Block and the Department of Anaesthesiology and Intensive Care is underway in the Health Care Complex in Bolesławiec. Construction works and equipment purchases will cost PLN 8 million. zloty. After completion of the works, which are scheduled for the second half of 2021, the intensive care unit will occupy the entire second floor of the main hospital building.

Three operating rooms, each adapted to perform different types of procedures, full anesthetic facilities, new apparatus and medical equipment, modern air conditioning and ventilation. In each room, including rooms directly next to patients’ beds, a new installation for administering medical gases is installed. One of the operating rooms will be used for orthopedics and traumatology procedures. The second room is dedicated to gynecology, the third to general surgery.

There is a recovery room next to the Operating Block. This will significantly improve the care of patients after the procedures, and improve patient safety. In the part of the ward, which will be occupied by patients requiring intensive medical care, there will be one isolation room and eight positions in the general room, including one standby position.

The new Operating Block, together with the use of the most modern medical systems, will significantly increase the safety of patients undergoing surgical intervention, as well as during the entire perioperative care.

A larger number of operating rooms and intensive care beds will allow for a significant extension of the range of procedures performed.
The organization and equipment of the wards have been thought out in a way that makes it possible to treat people infected with COVID-19 without putting other patients at risk.

Outside the building, the construction of an elevator has begun, which will serve all floors of the hospital.